Ground Water

  • Chemigation Program

  • Chemigation is the practice of applying fertilizer, additives or agricultural chemicals to crops through an irrigation system. If the correct precautions are not taken, chemicals can flow back through the irrigation system and into the well, polluting the ground water or other water source.
     
    In 1986 the Nebraska Legislature passed LB 284, the Chemigation Act, to protect our ground and surface water from possible contamination. The operator of a chemigation system is required to obtain a permit before chemigating. Permit holders are primarily liable for any damage resulting from chemigation and for maintenance expenses on their chemigation equipment.
     

    Certification Requirements

    Before a chemigation permit can be granted the operator is required to attend a certification class and pass a written exam. This certification is good for four years and entitles the operator to apply for a chemigation permit. Applicator/certification classes are sponsored by the University of Nebraska Cooperative Extension and are held in various locations during the winter and spring each year.
     

    Inspections

    Under provisions of the Nebraska Chemigation Act, Natural Resources Districts (NRDs) are responsible for inspecting each irrigation system through which any agricultural chemical will be applied to ensure that mandatory safety devices are installed and functioning. All operating permits are subject to periodic random inspections to ensure continued compliance. Any new system must be inspected before chemigation can begin.
     
    For more information on the required chemigation equipment set-up, click here.
     

    Chemigation Permit Fees

     
    New Permits: $75 per injection site
     
    Renewal Permits: $25 per injection site
     
    All permits are good for one year, expiring on June 1. New permits approved at any time during the calendar year expire on June 1 of the following year.
     
    As a courtesy to operators, renewal applications are mailed out from the UNWNRD office. However, it is the responsibility of each operator to contact the UNWNRD if he/she does not receive the necessary permits, to complete the required information and to return renewal permits by the deadline. Any permit not renewed by June 1 is subject to cancellation - the operator must then pay the new permit fee and have the system inspected to be eligible to chemigate again.
     

    Penalties

     
    Violators of the Chemigation Program will be submitted to county attorneys. Penalties consist of Class I, II, III or IV misdemeanors or a civil fine.
     
    For questions or comments on the Upper Niobrara White NRD’s Chemigation Program, please contact the Water Department at 308.432.6190.
  • Crop Water Use Report

  • Domestic Water Sampling

  • Ground Water Quantity Monitoring Program

  • How to Read your Irrigation Flow Meter

  • Ground Water Management Area

  • Tracking High Capacity Water Use

  • Ultrasonic Flow Meter Service

  • Well Permits and Registration

  • Wellhead Protection

  • Conservation Awards

  • Conservation Festival

  • Projects WET, WILD and Learning Tree

  • Presentations

  • Scholarships

  • Land Judging

  • Range Judging

  • NeRAIN

  •